Hi,
月底工單結帳前我們已做了
實際成本分割 CO KSS2
執行實際價格計算 CO KSII
檢查實際作業費率 CO KSBT
當我們做工單重估 CON2/MFN1,出現下列錯誤:
Production order with an actual activity update.
Message no. KA465
Diagnosis
In the plan, activity updates are relevant to price determination. The system uses a multi-level price determination in actual costing. In actual costing, the system already debited materials and credited the cost centers, and vice versa.
System Response
The system does not execute revaluation, to avoid posting the credits and debits twice.
目前系統有實施 ML
請問是有什麼設定未設嗎??謝謝